Strata approval for a condo kitchen renovation comes down to two things: knowing which changes your bylaws cover, and sending a complete written request before any work starts. Get both right and your council can say yes at its first review.
Skipping this step is costly. Owners who renovate without approval can face fines or orders to undo finished work, while a clear request keeps your contractor's start date on track.
This guide is for condo and townhouse owners in North Vancouver planning a kitchen update. It covers what needs approval, what to send, how to avoid delays and what to do if your strata says no.
What Needs Strata Approval in a Condo Kitchen?
Under Standard Bylaw 5, you need your strata's written approval before altering your unit if the work involves:
The building's structure, such as a load-bearing wall
Common property inside your unit, such as shared pipes, ducts or wiring
Parts the strata must insure, including original flooring, wall coverings and built-in plumbing and electrical fixtures
Many stratas have filed their own bylaws, which often add flooring, plumbing and electrical work. Where they differ, they replace the Standard Bylaws. The Province's guide to strata bylaws and rules explains how this works.
What to Include in Your Strata Approval Request
A complete request saves a round of questions. It usually includes:
A written description of the work
A floor plan or drawing of the changes
Your contractor's name and the planned work dates
Flooring specs, if your bylaws cover sound control
A signed agreement that you'll cover costs linked to the alteration
Your strata can't unreasonably withhold approval, but the Standard Bylaws let it ask you to accept related costs in writing.
How to Avoid Delays With Your Strata
To keep things moving:
Ask early. Get your strata's alteration form and bylaws before finalizing the design.
Check the council calendar. Submit before the next meeting, not the day after.
Plan for building rules. Ask about elevator bookings, work hours and debris removal.
Line up permits too. Strata approval doesn't replace your kitchen renovation permits from the City or District.
In the City of North Vancouver, plumbing, gas and electrical permits in multi-family buildings are taken out by licensed trade contractors.
What If Your Strata Says No?
Ask for the reasons in writing, then adjust your plans or answer the concerns. If you still can't agree, the Civil Resolution Tribunal handles many strata disputes in BC, including bylaw questions.
Planning a Condo Kitchen With a Local Contractor
Our owner, Joey Heilman, has 31 years as a renovation contractor. Every kitchen renovation starts with an in-home consultation and a written estimate, giving you a clear scope for your strata request.
Planning a condo kitchen? Call 778-893-7818 or request a free quote.
FAQs about Condo Kitchen Renovation Strata Approval
Here are quick answers to common questions:
Do I need strata approval to replace kitchen cabinets?
Usually, if the cabinets are original fixtures or the work touches plumbing or wiring. Check your bylaws.
Can I start work while I wait for approval?
No. Starting early risks fines and an order to restore your unit.
How long does strata approval take?
It depends on when your council meets and how complete your request is.
Does strata approval replace a City permit?
No. They're separate, and you may need both.
Can my strata refuse a kitchen renovation?
Under the Standard Bylaws, your strata can't refuse unreasonably. Your own filed bylaws may set different rules.